Friday, March 1, 2013

Sewing room transformation

View from the door looking at north side of room
View from door to southeast side of room

View from door into room

Totally organized closet.  These are cubes made by Closet maid.  Pillows and beds on the floor for our two fur babies.  Walls were originally pale yellow in color with white ceiling and trim.  The purple spot was a test spot for a possible trim color when I was thinking of doing the room in lavender.  

Walls are done being painted with a pinkish (very very light hue) beige.  This is a piece of the oak flooring that will be installed.


Walls are painted - now removal of carpet.  Notice the nice lump in the carpet.

So there are two layers of carpet.  The top layer was installed with double sided sticky tape around the parameter.

Under the first layer of carpet is another layer of carpet. 

Second layer of carpet was glued (along with a foam pad) to the original Douglas fir floor.  Based on other renovations in this house I knew the Douglas fir floor would not be able to be saved.

Creative way to patch holes - inside lids of canning jars - a total of three holes were patched this way

 
The only way to remove the foam was to scrape it off the floor with a putty knife.  Note that I am being supervised.   

There were a few unpatched holes in the floor.  This one gives me a glimpse into the basement where I can watch my hubby switch the laundry.

This was a very long process and it was discovered that they also had glued vinyl time to the floor.

Foam is up.  Floor is mostly level (house is 111 years old).  Note that the baseboard on the right side is almost flush with the wall.  This occurred on two sides of the room.  One side (behind the heater) the baseboard was at the correct place.  However on the left hand side wall there was no baseboard.  This is the order of installation in the room: 1) Douglas fir floors, 2) one layer of dry wall, 3) layer of self adhesive tile, 4) another layer of vinyl tile and adhesive with only part of the previous layer removed, 5) glued down foam and first layer of carpet, 6) install baseboards, 7) install another layer of drywall and plaster over previous walls, 8) using sticky tape, lay down another layer of carpet.


Installing the new solid oak floors

Oak floor installation

Getting closer to done
My wonderful hubby hard at work


Finished floor installation


Pretty new floors!


Added another layer of baseboard in order to cover edges of wood floor







Tuesday, February 26, 2013

Sewing room overhaul: the results

View from doorway

View just inside doorway


View from bookshelf

View from window

Closet full of goodies plus pillows and beds for the dogs!

All my RA thread


Right toolbox- contains thread and other embellishment items





Some goodies

Another view of my embroidery thread

"Some" of my stabilizer

View from closet - left toolbox contains notions and machine parts/accessories 






Ellie all put away





Magic approves of her new "spot"